PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

East Side of the Building.jpg Installed sprinkler pipes at the 2nd floor Facing North.jpg Laying out block at the 3rd floor detention cells Facing North.jpg Laying out block at the 3rd floor Detention cells Facing West.jpg Sprinkler pipe material.jpg 3rd floor Interior metal framing Facing North-West.jpg Constructing parapet along the High Roof Facing South-West.jpg Constructing the parapet along the high roof Facing East.jpg Installed junction boxes at the cmu wall.jpg
Previous pageNext page Sprinkler pipe material
Sprinkler pipe material